Chameleon Icons
/
CommunityTopHow it worksTrace a pictureSign in
Critical path icon

Critical path icon

In 3 styles: 0 by the community, 3 from open source icon sets. Open one to copy it, download it or draw more.

A critical path in a project network. Five small round nodes joined by lines into a pentagon: one at the top, one at the far left, one at the far right and two along the bottom. The top and side nodes are bold, the bottom two are open rings.

In 3 open source icon sets

Icons near it